Chandler Highway Upgrade (VIC)

Fabrication and installation of noise barriers on the west side of the new bridge.

Project Overview
Fabrication and installation of noise barriers on the west side of the new bridge.

  • It spanned the entire length of the structure, between Rex Avenue and Yarra Boulevard.
  • The noise barriers vary in height between 3 and 3.5 meters above road level. The noise barrier on the new Chandler Highway Bridge is 2 meters tall.
  • The design of steel modules were modelled to match the original bridge
  • 60 Steel modules housing the acrylic panels (4 Panels per modules – 240 Acrylic Panels)
  • 3 different colours of acrylic panels were to match the surrounding flora.

Client
Seymour Whyte Constructions

Year
2018 – 2019

Location
Melbourne, Victoria